"SPINA passed the tests with excellent results"
9 February 2024
After having successfully passed tests in the Velim Railway Test Track and in the VUKV and VUZ test centre, our new tank wagon Zacens 75 has returned to Nymburk and will be offered to customers in many specifications and volumes from 40 m3 to 75 m3. The frame layout enables to assemble the appropriate tank wagon size for a particular product.
The basic parts will be identical, the production line will be adapted for easy changes of the wagon parameters. The base consists of a frame with centre longitudinal member with wagon ends prepared for DAC. The tank is mounted on reinforced longitudinal saddles, without transverse support.
The equipment and fittings of the wagon are in accordance with the Regulations concerning the International Carriage of Dangerous Goods by Rail RID and the customer's requirements. The tank wagon is designed for the transport of heavy petroleum products, phenol, acids, fertilizers, molten sulphur and other chemical substances.
We expect to deliver the first "SPINA" tank wagons to customers in Q1 2025.
The change of headquarters
1 November 2020
On November 1, 2020, the headquarters of NYMWAG CS a.s. has changed.
Thirty ATIR-Rail tanks left NYMWAG
27 October 2020
Thirty Zacns 88 tanks for our customer, the French company ATIR-Rail, left NYMWAG CS a.s.
Delivery of 22 container wagons for MFD Rail
21 October 2020
We handed over 22 container wagons to our new customer, the Swiss company MFD Rail
30 wagons Zacns 88 m³
11 September 2020
The first wagons from NYMWAG, that will be used by petrochemical company TOTAL.
A small step for the mankind, a great leap for NYMWAG
26 March 2020
Completion of the first flat wagon.